(1,363 m - 2,174 m)
Operating times: Fri, 11 Jun - Sun, 03 Oct 21
Uphill ride daily 8.30 am- 4.45 pm
Last downhill ride midway station - valley 5.00 pm
max. 3 persons with bike
Capacity: 675 pers./h
In the 2021 summer season (11 Jun - 03 Oct 21) mountain bike transport is available on:
|
|
|
|
|
(1,363 m - 2,174 m)
Operating times: Fri, 11 Jun - Sun, 03 Oct 21
Uphill ride daily 8.30 am- 4.45 pm
Last downhill ride midway station - valley 5.00 pm
max. 3 persons with bike
Capacity: 675 pers./h
(1,912 m - 2,663 m)
Operating times: Fri, 11 Jun - Sun, 03 Oct 21
Uphill ride daily 9.00 am - 4.00 pm
Last downill ride 4.00 pm
max. 4 persons with bike
Capacity: 480 pers./h
(1,353 - 2,284 m)
Operating times: Fri, 11 Jun - Sun, 03 Oct 21
Uphill ride daily 8.30 am- 4.45 pm
Last Downhill ride 5.00 pm
max. 2 persons with bike
Capacity: 450 pers./h
(1,937 m - 2,291 m)
Operating times: Fri, 11 Jun - Sun, 03 Oct 21
Uphill ride daily 8.30 am- 4.45 pm
Lunch break 12.00 non - 1.00 pm
Last downhill ride 5.00 pm
max. 2 persons with bike
Capacity: 160 pers./h
(1,350 m - 1,457 m)
Operating times starting Fri, 11 Jun 21
daily 8.30 am - 8.00 pm
max. 6 persons with bike
Capacity: 120 pers./h
Doppelmayr developed an innovative bike carrier assembly specially for the transportation of mountain bikes. It is comprised of three main components: bike clip, clip carrier and bike stabilizer. The individual parts are made of high-quality aluminum and are ideal for transporting bikes with a wheel size of 24”–29” in combination with the special mountings. When the biker inserts the front wheel of the bike between the pivot-mounted upper arm and the rigid lower arm, the cradle is moved by the self-weight of the mountain bike, causing the bike clip to fix the wheel in position. The sturdy, sophisticated mechanism and design enable top safety and optimal comfort for the carriage of bikes and riders.
Suitable for bikes with the following specifications:
More information on www.doppelmayr.com